page 1
page 2
page 3
page 4
page 5
page 6
page 7 page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
< prev - next > Energy Biogas Biogas Digest Vol 2 (Printable PDF)
biogas plant can also play an important role and are described seperatly: Heating systems,
pumps, weak ring.
Construction details
The section on construction of biogas plants provides more information on:
Agitation
Heating
Piping systems
Plasters and Coats
Pumps
Slurry equipement
Underground water
Starting the plant
Initial filling
The initial filling of a new biogas plant should, if possible, consist of either digested slurry
from another plant or cattle dung. The age and quantity of the inoculant (starter sludge) have
a decisive effect on the course of fermentation. It is advisable to start collecting cattle dung
during the construction phase in order to have enough by the time the plant is finished. When
the plant is being filled for the first time, the substrate can be diluted with more water than
usual to allow a complete filling of the digester.
Type of substrate
Depending on the type of substrate in use, the plant may need from several days to several
weeks to achieve a stable digesting process. Cattle dung can usually be expected to yield
good gas production within one or two days. The breaking-in period is characterized by:
low quality biogas containing more than 60% CO2
very odorous biogas
sinking pH and
erratic gas production
Stabilization of the process
The digesting process will stabilize more quickly if the slurry is agitated frequently and
intensively. Only if the process shows extreme resistance to stabilization should lime or more
cattle dung be added in order to balance the pH value. No additional biomass should be put
into the biogas plant during the remainder of the starting phase. Once the process has
stabilized, the large volume of unfermented biomass will result in a high rate of gas
production. Regular loading can commence after gas production has dropped off to the
expected level.
Gas quality
As soon as the biogas becomes reliably combustible, it can be used for the intended
purposes. Less-than-optimum performance of the appliances due to inferior gas quality
should be regarded as acceptable at first. However, the first two gasholder fillings should be
vented unused for reasons of safety, since residual oxygen poses an explosion hazard.
Managing input- and output-material
Substrate input
For a simple, small-scale biogas system, only a minimum amount of time and effort must be
spent on procuring the feedstock and preparing it for fermentation. The technical equipment
is relatively inexpensive. Theoretically any organic material can be digested. Substrate pre-
6